top of page
logo_font_recommendationsioio.png

At Efes Marine Industrial Engineering, our project management system starts with detailed project planning and ends with the final invoice meetings of the projects. During this period, the scope of work is clarified with the ship owner (inspector, ship crew, class if necessary), and the repair time and costs of the ship are calculated according to other shipyard offers.

 

After starting the project, the scope of work and shipowner's directives are followed on a daily basis along with the class. In all cases, the quality of workmanship or materials is taken into account according to the owner's instructions. Our project engineers are always on board during working hours. The scope of work and the project plan are constantly checked.

​

List of Turkish Floating & Drydocks

Inspection Service

Surface paint inspections and inspections in the marine industry require a wealth of experience and knowledge to meet the high demands for quality.

Efes Marine, with its Frosio Level 3 paint inspector, provides the highest inspection standards to meet customer expectations throughout the preparation and surface coating process.

Our expert team, which checks the compliance of the surface preparation and coating operations with the standards with the controls made throughout the process, works to achieve maximum performance.

Our experienced team will work with customers for maintenance and paint jobs in the first place, discuss the service life to be achieved and form the basis of the tests to be carried out. Our corrosion and paint inspectors provide consultation to meet the expected service life.

Project Management Service

  • Instagram
  • Linkedin
bottom of page